To meet EPA requirements for Bunding and Spill Containment the bund must be able to contain;
110% of the largest drum stored or 25% of the total volume stored, whichever is the greater
Note: Bunds can be linked with the optional sump-to-sump drain kit in order to meet holding capacity requirements. Drive over bunding can be used to turn a concrete floor into a bund for larger areas